• Portfolio of Work
    • People
    • Studio
    • Services
    • Heritage
    • News
    • Contact
Back To All Work
Back To All Work

RCBI

Robert C. Byrd Institute for Flexible Manufacturing

In 1999 the Robert C. Byrd Institute commissioned us to renovate their 48,000 sf building into manufacturing and demonstration space, as well as change the building’s exterior image to better reflect the Institute’s mission. A high tech, carefully detailed and executed composite aluminum panel system was chosen for the exterior. The first floor was renovated to expand the shop and demonstration areas which house the latest technology in machinery and tools used in industrial manufacturing.  In 2014 we were asked to replace the existing lobby escalators with a monumental stair.  The steel, glass and cable stair structure reflects the Institute’s commitment to modernization and technology.

Share This:

Share on X Facebook LinkedIn Email
  • 1401 Sixth Avenue, Huntington, West Virginia 25701 (304) - 697 - 4990

Copyright 2025, All Rights Reserved. Site by MESH.